南華大學機構典藏系統:Item 987654321/19200
English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 18278/19583 (93%)
造訪人次 : 1027786      線上人數 : 650
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋
    請使用永久網址來引用或連結此文件: http://nhuir.nhu.edu.tw/handle/987654321/19200


    題名: 考量同步作業下之雙邊生產線平衡問題
    其他題名: Two-Sided Assembly Line Balancing Problem with Concurrent Engineering
    作者: 陳輝恭
    Chen, Hui-kung
    貢獻者: 企業管理系管理科學碩博士班
    藍俊雄
    Chin-hsiung Lan
    關鍵詞: 雙邊生產線平衡;型二問題;周程時間
    Type II Problem;Two-sided Assembly Line Balancing;Cycle Time;LINGO
    日期: 2010
    上傳時間: 2015-03-10 16:17:39 (UTC+8)
    摘要:   生產設計的良莠與否,對製造業的生產成本與獲利能力,存有顯著的影響。而就生產製造來說,良好的生產率是維持競爭力的重要關鍵。長久以來,生產線平衡的研究主要在討論單邊生產線的平衡問題;近年來,由於產品多樣化造成零工生產的主流時代來臨,而在廠房空間侷限下,對於多產品生產線的籌設,實有困難存在。因此,對擁有較小佈置空間的雙邊生產線需求也日益增加。有鑑於此,在有限空間下進行雙邊生產線的最適生產效率之佈置,就成為一實務上的重要問題,因此本研究提出一個考量同步作業下的雙邊生產線平衡問題之型二問題(Type II of Two-sided Assembly Line Balancing Problem with Concurrent Engineering)模式,本模式將同步工程的哲理導入雙邊生產線平衡問題之中,其主要目標在於求取最適的生產周程時間與改善整體生產線的生產效率。   本研究主要建構一個整數非線性規劃(integer nonlinear programming, INLP)數學模型來描述雙邊生產線平衡之型二問題情形,應用套裝軟體Lingo的語法將上述模式具體化,且藉由軟體內建的Global Solver作全域搜尋、運算,取得最佳解。此外,本模式藉由數值模擬在給定不同工作站數目的情況下,求取最適的生產周程時間與生產率,使製造者不致低估其生產率及高估空間使用率,以錯失獲利。
      The production design will affect the production costs and its profitability of manufacturing enterprise. A good production rate plays the important role in keeping the competitiveness for manufacturing industry. The major discussion of assembly line balancing problem is to investigate the one-sided assembly line balancing problem. The Job-Shop production becomes main streams for manufacturing industry because of the diversities of products. The diversities of products also lead the spatial problem for the deployment of multi-product production lines. Thus, the necessity of two-sided assembly line deployment is arising. Whenever the space is constrained for practical situations, the determination of optimal production rate becomes the serious problem under the fixed deploying area. Therefore, this study proposes a type II of two-sided assembly line balancing problem in considering the concurrent engineering. The proposed model applies to the theory of concurrent engineering into the two-sided assembly line balancing problem, and then aims to find out the optimal cycle time and improve the production rate.   This study mainly constructs an Integer Nonlinear Programming (INLP) mathematical model to describe the situation of two-sided assembly line, and apply syntax Lingo extended version to specifies the above model by the software built-in solving method "Global Solver" for global search, operations and obtain optimal solution. In addition, this paper is to find out the optimal cycle time and production rate of workstations for a given exemplified case to avoid the underestimation of production rate and the overestimation of occupied rate of space.
    顯示於類別:[企業管理學系(管理科學碩/博士班,非營利事業管理碩士班)] 博碩士論文-管理科學碩博士班

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    098NHU05457004-001.pdf593KbAdobe PDF0檢視/開啟
    index.html0KbHTML139檢視/開啟


    在NHUIR中所有的資料項目都受到原著作權保護.

    TAIR相關文章

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 回饋