南華大學機構典藏系統:Item 987654321/20785
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 18278/19583 (93%)
Visitors : 1074309      Online Users : 983
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Please use this identifier to cite or link to this item: http://nhuir.nhu.edu.tw/handle/987654321/20785


    Title: 基於作業基礎成本制之軟體開發成本研究
    Other Titles: The Study of Software Development Costs Based on Activity-Based Costing
    Authors: 謝馥安
    Shieh, Fu-Ann
    Contributors: 資訊管理學系碩士班
    謝建成;鍾志明
    Shieh, Jiann-Cherng;Chung, Chih-Ming
    Keywords: 作業基礎成本制;軟體開發成本;軟體發展模式
    Activity-Based Costing;Software Development Cost;Software Development Models
    Date: 2001
    Issue Date: 2015-05-15 15:15:17 (UTC+8)
    Abstract: 軟體開發成本一直是軟體業存在的迷思。而讓這個迷思無法破解存在至今的原因,不外乎是因為軟體開發成本所牽涉的層面實在是太廣泛。從管理層面到政策、技術層面都包含在軟體開發成本的議題之中。於是在想要解決這個議題的同時,就必須要了解當中各因素間相互影響的關係,方能在了解狀況下,做出正確的、最適宜的人事物的配置,以達到管理者所欲達成的效果。本文中我們將以作業基礎成本制的觀點論述關於軟體開發成本、開發工具、軟體發展模式及開發人員、參與人員間的互動關係;讓對於軟體開發成本有影響力的人事物能夠更透明的顯現;讓管理者對於軟體開發成本的控制與運用能夠更進一步的有效掌握,甚至能夠達到決定軟體開發成本要如何發生。 在分析個案研究機構之16個MIS開發專案的軟體開發成本資料後,本研究歸納出下列研究發現: 1、軟體開發成本和開發工具複雜度呈正比關係,顯示開發工具的選擇將影響軟體開發成本的發生。 2、軟體開發成本和開發過程中使用之工具數呈正比關係,顯示開發工具的取捨將影響軟體開發工具的發生。 3、軟體開發時程偏長或偏短時,單位人員成本較高,顯示軟體開發時程將影響開發人員的選擇。 4、系統分析師、程式設計師及參與者之工時配置與其專業能力有關,顯示參與人員與開發時程的工時配置彼此間互有影響。
    Appears in Collections:[Department of Information Management] Disserations and Theses

    Files in This Item:

    File Description SizeFormat
    089NHU00396007-001.pdf493KbAdobe PDF452View/Open
    index.html0KbHTML200View/Open


    All items in NHUIR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback