English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 18278/19583 (93%)
造訪人次 : 914516      線上人數 : 1352
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋
    請使用永久網址來引用或連結此文件: http://nhuir.nhu.edu.tw/handle/987654321/29573


    題名: Dynamic production control for determined quantity and deadline
    作者: 陳淼勝;Chen, Miao-Sheng
    貢獻者: 企業管理學系
    關鍵詞: DPP Model;obtainable working hour capacity;unreliable machines;efficient dynamic updating tool
    日期: 2003
    上傳時間: 2023-08-03 14:20:45 (UTC+8)
    摘要: The Dynamic Production Plan (DPP) Model for reaching an optimal control of the production undergoing the limitations of future obtainable working hour capacity and unreliable machines is proposed in this paper. It can be applied to the evaluation of a firm's capability of accepting the new order or not. It is also suggested that the deadline of the production, maintenance cost of an unreliable machine, order quantity, and the production yield should be taken into considerations. In addition, sensitivity analyses of the key variables of optimal solution are presented. Actually, this study efficiently provides a dynamic updating tool capable of revising the production plan (rate) at any time for the production planner having great insight.
    關聯: Journal of Statistics and Management Systems
    vol. 6, no. 3
    pp.479-492
    顯示於類別:[企業管理學系(管理科學碩/博士班,非營利事業管理碩士班)] 期刊論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML178檢視/開啟


    在NHUIR中所有的資料項目都受到原著作權保護.

    TAIR相關文章

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 回饋